Causeway Inspection Division provides an exclusive service
to the Petrochemical Industry, with an experienced engineering team available to manage
and implement QA/QC of the installation of refractory lining systems, insulating,
ceramic/brickwork and fibre linings, either on site or in fabrication shops.
Control of project or maintenance performance can be
achieved through our initial assessment of works procedures and method statements, review
of drawings, analysis or recommendation of lining design, followed by first phase testing
of lining materials, installation equipment and contractor personnel qualification.
During new equipment lining or regular lining maintenance
this process is continued by assessment of (maintenance) linings condition and partial or
continuous monitoring of all stages of works with a thorough series of progressive checks
developed over the past twenty years to suit all designs and circumstance of situation.
Upon completion Causeway Inspection Division provide a
written review / report so that a complete detailed record of status is maintained for
reference, with future requirements thoroughly addressed.
The provision of this service thus allows the client the
option of thorough know how by either incorporating Causeway personnel into an
existing QA/QC structure of using Causeway management experience to import the system
wholesale.
Capital Project Inspection
Project Planning
Project Qualification
Monitoring
QA/QC
Final Inspection
Turnaround Maintenance Inspection
Pre-Turnaround
On-Site Inspection
Monitoring
QA/QC
Final Inspection
Laboratory Testing Facilities
Independent Testing and Research Facility
The Causeway Laboratory is fully equipped to undertake Refractory Testing in accordance
with A.S.T.M specifications.
 |